Calibration
Certificate of calibration traceable to National Physics Laboratory (NPL) and in compliance with ISO 9001:2000, are part of our normal calibration process and are included with the equipment when it is supplied.
The master calibrator input source is calibrated at Electronics Regional Test Laboratory (ERTL)
ERTL is one of the laboratories of STQC Directorate, Department of Information Technology, Ministry of Communication & Information Technology, Government of India engaged primarily in providing Accredited Calibration and Testing facilities
On site calibration – normal turnaround for calibration is 5 working days. We can assist you in locating an accredited calibration laboratory within your locality. For more details contact us.
|
|
| |
CE Mark |
|
| |
Equipment successfully tested for
| • |
Risk assessment as per EN1050:1996 |
| • |
LVD compliance, tested for Input Current, Insulation Resistance, Ground Continuity, Audible Noise, High Voltage (1000 volts) |
| • |
EMI / EMC compliant, tested for Conducted Emissions, Electrostatic Discharge, Electric Fast Transient and Surge |
|
|
| |
|
|
| |
COMPLIANCE TO EN60601-1/IEC60601-1 |
|
| |
|
|
| |
| • |
Earth Resistance test ( As per BS EN 60601-1:1990 ; Clause No 8 ) |
| • |
Dielectric test ( As per BS EN 60601-1:1990 ; Clause No 20.4 ) |
| • |
Leakage Current test ( As per BS EN 60601-1:1990 ; Clause No 19 ) |
| • |
Insulation Resistance ( As per BS EN 60601-1:1990 ) |
|
|
| |
|
|
| |
------------------------------------------------------------------------------- |
|
| |
|
|
| |
Validation Protocol |
|
| |
|
|
| |
User manual supplied contains elaborate information with respect to equipment operation, service and maintenance |
|
| |
With DQ…IQ…OQ…PQ…validation protocol |
|
| |
|
|
| |
Design Qualification |
|
| |
Objective: To confirm that the equipment its components and spare parts have been received as per manufacturers specifications |
|
| |
|
|
| |
Installation Qualification |
|
| |
Objective: To ensure equipment is properly installed and ready to use |
|
| |
|
|
| |
Operation Qualification |
|
| |
To check if equipment and its parts are working and are in order |
|
| |
|
|
| |
Performance Qualification |
|
| |
To test the equipment and verify its operation to provide evidence that it is performing to manufacturers specification |
|
| |
|
|